This Steel 2 Section Tarp Roller Insert creates a greater reinforcement than the standard tarp roller couplers provided with the 2-section 30′ and 40′ rollers.
Installation Instructions For Tarp Roller Insert:
- Clean the inside of the roller about 12″ from each end.
- Put a piece of tape about 8″ from the end of the roller.
- Put Liquid Nail on the inside of the roller.
- Place the aluminum insert into the tape mark.
- Make sure the rollers are level.
- Start putting sheet metal screws in the pre-drilled holes.
- Untape the insert so it covers the ID of the roller.
- Install all of the sheet metal screws.
- Bore holes through the roller and insert for carriage bolts. These holes should be about 13″ apart.
- Install the carriage bolts with the nut to the inside.
- Repeat the above process on other rollers.
- It may require someone to crawl inside the roller.

![[ 4 ] 6' W X 6' L Heavy-Duty Flexible Steel Drag 1 [ 4 ] 6' W X 6' L Heavy-Duty Flexible Steel Drag -Baseball Apparel Shop 01443](https://www.gamebaseballus.com/wp-content/uploads/2023/03/01443-100x100.webp)
![[ 3 ] 3' W X 5' L Standard Flexible Steel Drag 2 [ 3 ] 3' W X 5' L Standard Flexible Steel Drag -Baseball Apparel Shop 02976 1](https://www.gamebaseballus.com/wp-content/uploads/2023/03/02976_1-100x100.webp)
![[ 4 ] Steel 2-Section Tarp Roller Insert 3 [ 4 ] Steel 2-Section Tarp Roller Insert](https://www.gamebaseballus.com/wp-content/uploads/2023/03/image_not_available_field_maintenance_1_4.webp)

Reviews
There are no reviews yet.